CHALLENGES
Engineering obstacles, setbacks, and unsolved problems for lunar settlement
C:\MOON\CHALLENGES> load ENGINEERING_OBSTACLES.DAT
CATEGORIES: 6 engineering domains
TOTAL CHALLENGES: 56 documented obstacles
CRITICAL PATH ITEMS: Orbital refueling, ECLSS, radiation
STATUS: ACTIVE DEVELOPMENT
// PROPULSION_CHALLENGES.LOG [10 entries]
- [01]Raptor engine reliability for 100+ reuse cycles without overhaul
- [02]Cryogenic propellant boiloff during 4.5-day Earth-Moon transit
- [03]Orbital refueling: reliable ship-to-ship cryogenic fluid transfer in zero-g
- [04]Tanker flight cadence: achieving 7-day pad turnaround at scale
- [05]Throttle precision for final 100m lunar descent on unimproved terrain
- [06]Engine restart reliability after months of cold storage on lunar surface
- [07]Methalox propellant production from lunar water ice (ISRU-derived)
- [08]Propellant depot zero-boiloff storage in permanently shadowed craters
- [09]Abort mode engine performance during powered descent phase
- [10]Hot gas impingement on lunar surface during landing and ascent
// HABITAT_CHALLENGES.LOG [10 entries]
- [01]Inflatable module deployment reliability after months in cargo bay
- [02]Seal integrity under 300°C thermal cycling (sunlight to shadow)
- [03]Regolith 3D printing consistency with variable feedstock composition
- [04]Radiation shielding verification: actual vs modeled GCR attenuation
- [05]Micrometeorite impact resistance of habitat shell materials
- [06]Airlock dust contamination prevention during EVA cycling
- [07]Structural fatigue monitoring over multi-year pressurization
- [08]Emergency bulkhead door actuation speed (<10 seconds to seal)
- [09]Habitat interconnect tunnel leak rate below 0.01% per day
- [10]Fire suppression in low-gravity pressurized environments
// POWER_CHALLENGES.LOG [8 entries]
- [01]Solar array degradation from lunar dust accumulation
- [02]Battery thermal management during 14-day lunar night
- [03]Microwave power beaming efficiency over 1+ km distances
- [04]Nuclear Kilopower reactor heat rejection in vacuum
- [05]Power distribution cable routing across regolith terrain
- [06]Solar array deployment robotics on uneven crater rim surfaces
- [07]Redundant power path switching during array failures
- [08]Electrostatic dust mitigation on solar panel surfaces
// COMMUNICATION_CHALLENGES.LOG [7 entries]
- [01]Continuous Earth-link from south pole (line-of-sight geometry)
- [02]Frozen orbit relay satellite constellation maintenance
- [03]High-bandwidth data return for science and medical telemetry
- [04]Communication during EVA in shadowed crater regions
- [05]1.3-second round-trip delay impact on telerobotic operations
- [06]Network resilience: single relay satellite failure scenarios
- [07]Deep space navigation accuracy for precision landing guidance
// HUMAN_FACTORS_CHALLENGES.LOG [11 entries]
- [01]Bone density loss: 1-2% per month in lunar 1/6 gravity
- [02]Muscle atrophy countermeasures for 180-day surface tours
- [03]Psychological effects of prolonged isolation and confinement
- [04]Circadian rhythm disruption from 14-day light/dark cycles
- [05]Radiation-induced cancer risk management and monitoring
- [06]Medical emergency response with 4.5-day evacuation minimum
- [07]Crew interpersonal conflict resolution in confined quarters
- [08]Lunar dust inhalation toxicology: chronic low-level exposure
- [09]Nutritional adequacy from stored and greenhouse-grown food
- [10]Sleep quality in low gravity with operational noise
- [11]Visual impairment from intracranial pressure changes
// LOGISTICS_CHALLENGES.LOG [10 entries]
- [01]Supply chain: Earth-to-Moon cargo delivery frequency and reliability
- [02]Spare parts inventory management for 180-day resupply intervals
- [03]Landing pad surface integrity after repeated Starship landings
- [04]Cargo offloading in 1/6 gravity with EVA-suited crew
- [05]Consumables tracking and expiration management
- [06]Waste processing and recycling of non-biological materials
- [07]Tool and equipment standardization across international partners
- [08]Emergency supply cache pre-positioning at remote EVA sites
- [09]Rover maintenance and tire replacement on abrasive regolith
- [10]Propellant quality verification after ISRU production
// ANALYSIS_NOTES.TXT
These challenges represent the known engineering obstacles to establishing a permanent human settlement on the Moon. Each must be solved — not theoretically, but with hardware that works in an environment where failure means death.
The Moon does not grade on a curve. Every system must work the first time, every time, for years without replacement. This is the hardest engineering problem humanity has ever attempted.
C:\MOON\CHALLENGES> █